We confirm our readiness, capability and
availability of energy product (1,000,000 MT) x
12 MONTHS of M100-MAZUT 100 GOST 10585-75 for
immediate sales; If all the terms and
conditions are mutually agreed and after verification of the
availability of funds and readiness of buyer to commence transaction.
All the supply is guaranteed to meet the specifications and to pass the
stringent requirements of SGS. All negotiation is strictly hold,
directly with authorized buyer representative.
We offer with full corporative responsibility as the producer, this
offer to sale on the following goods. And sign sales and purchase
contract if all conditions of procedure is met.
PRODUCT: M100-MAZUT 100 GOST 10585-75
SELLER will provide partial proof of product
for buyer’s verification and issues full proof of product to buyer's
bank, after signing hard copy of contract and acceptance of buyer's
proof of fund.
PRICE: USD $260/$250 CIF CHINA/ CIF ASWP
Commission: USD5.00 for seller side
USD5.00 for buyer side:
USD1.67 buyer mandate
USD1.66 my group (George Lu) USD1.67 your group
PAYMENT: Payment will be made in the currency
of US DOLLARS. Payment will be made through an
irrevocable, revolving documentary letter of credit, issued or confirmed
by renowned bank per shipment basis or monthly, revolving till next
Month.
QUANTITY: SELLER will provide confirmation
letter/ resource notice from production refinery confirming actual
quantity of M100-MAZUT 100 GOST 10585-75 for export to buyer.
M100-MAZUT 100 GOST 10585-75 /(1,000,000) MT
PER MONTH X 12 MONTHS, (with rollover and
extension). QUALITY:
An independent surveyor company will be employed to certify the quality
of product at the port of loading and bottled sample will be sent to
buyer for further verification/confirmation; as specified below, SELLER
will provide certificate of quality (SGS) to buyer's bank as in
accordance with international standard as specified below
PERFORMANCE BOND:
SELLER will provide a 2% operative performance guaranty (bond) to
buyer's bank to activate buyer's payment instrument.
INSPECTION:
Independent surveyor (SGS) will issue quality certificate at the port of
loading and sample text will be sent to buyer for confirmation.
DELIVERY: ( CHINA)
SELLER will provide notice of vessel booking and shipping agreement as
part of full proof of product after receipt and confirmation of buyer's
bank's payment instrument. The first shipment
scheduled to be within/before 35 days from date of acceptance and
endorsement of contract .
QUALITY SPECIFICATION IS SUBJECTED TO CHANGES
AS MAY BE AGREED OR REQUESTED BY BUYER
email:
E-mail:info@martongulf.com
|